Geothermal Heating and Cooling Essay by Top Papers

Geothermal Heating and Cooling
This project is a proposal for improving any construction-related or environmental engineering-related aspect of the NE1 building on BCIT's (British Columbia Institute of Technology) Burnaby campus. The building designated NE 1B is 31 years old and ...
# 137426 | 2,750 words | 0 sources | APA | 2008 | US
Published on Dec 01, 2008 in Engineering (Civil and Environment)


$19.95 Buy and instantly download this paper now

Description:

This project is a proposal for improving any construction-related or environmental engineering-related aspect of the NE1 building on BCIT's (British Columbia Institute of Technology) Burnaby campus. The building designated NE 1B is 31 years old and is a concrete building. The intent is to change the existing heating and cooling system to a geothermal system.

From the Paper:

Introduction This project is a proposal for improving any construction-related or environmental engineering-related aspect of the NE1 building on BCIT's (British Columbia Institute of Technology) Burnaby campus. The building designated NE 1B is 31 years old and is a concrete building. The intent is to change the existing heating and cooling system to a geothermal system. This will require careful consideration of the hearing and cooling needs of this structure and the way the system can be adjusted to heat and cool the building as economically as possible. Technology

Cite this Essay:

APA Format

Geothermal Heating and Cooling (2008, December 01) Retrieved July 05, 2020, from https://www.academon.com/essay/geothermal-heating-and-cooling-137426/

MLA Format

"Geothermal Heating and Cooling" 01 December 2008. Web. 05 July. 2020. <https://www.academon.com/essay/geothermal-heating-and-cooling-137426/>

Comments